Following MedINA’s seven previous articles (March, July and November 2023, May and November 2024, July 2025, and March 2026), this article presents an updated overview of the licensing status of Small Hydropower Plants (SHPs) in the Aoos River Basin, based on the available data from the Regulatory Authority for Waste, Energy and Water (RAAEY). A detailed description of the methodology used to monitor SHPs, as well as the individual stages of the licensing process, is provided in MedINA’s first article on the subject.
Almost 50% fewer SHPs in the Aoos River Basin in just 3.5 years!
A significant change has been observed in the spatial planning of hydropower development in the Aoos River Basin. More specifically, there has been a steady downward trend in the total number of projects at various stages of the licensing process. The number of projects has now decreased to 26, compared to the 49 projects recorded by MedINA during its initial assessment in March 2023, according to the latest data from RAAEY (November 2026). This represents a decrease of 23 projects, or nearly 47% compared to the initial assessment (Figure 1). The total capacity (installed and nominal) has decreased to 37.37 MW.
During the monitoring period, three SHPs, in Chelimodi, Kefalovryso, and Gorgopotamos, were also submitted for public consultation through the Electronic Environmental Registry. However, according to the latest RAAEY data, the licensing procedures for both the Kefalovryso and Gorgopotamos SHPs have been automatically terminated by operation of law.

I. Current Licensing Status and Spatial Distribution of SHPs in the Aoos River Basin
According to RAAEY data, the total number of SHPs in the Aoos River Basin currently at various stages of the licensing process is 26, representing a decrease of six applications compared to March 2026. Of these 26 SHPs, four are already operating with valid operating licenses, one has obtained an installation license (on the Giotsa stream), 16 have obtained production licenses, and five are under evaluation (Figure 1 and Map 1).
The changes mainly concern the production licenses, which have decreased by seven, while the number of applications under evaluation has increased by one. Figure 1 illustrates the licensing status of SHPs in March, July, and November 2023, May and November 2024, July 2025, and March and November 2026.
Regarding production licenses, one new registration was identified on the Vourbianitiko stream, within the Natura 2000 site GR1320002. This development raises particular concern, as it follows the automatic termination, in November 2025, of the Producer Certificate for the Gorgopotamos Small Hydropower Plant (SHP), with a capacity of 2.39 MW, located on the nearby Makryrema stream, in the Mastorochoria Municipal Unit of the Municipality of Konitsa. This development highlights a significant contradiction: While the termination of the previous project was a positive step towards protecting the area, the registration of a new SHP in the same wider area indicates that pressures for hydropower development remain.
Furthermore, eight production licenses were either terminated or revoked. Among them three were located in the Aoos sub-basin and five in the Sarantaporos sub-basin. More specifically, two were located on the Vourbianitiko stream and one on the Lykorrachi stream, within the Natura 2000 site GR1320002. It should be noted that one of the projects whose license was terminated (located near Pefkofyto) was resubmitted and is currently under evaluation.

II. SHPs with Environmental Impact Assessment (EIA) Approvals
Regarding EIA Approval, no changes have been identified compared to the situation in July 2025. The SHP on the Giotsa stream, which received an EIA Approval in 2024, has obtained an installation license (see above), while six other SHPs have secured EIA Approvals, meaning they are very close to obtaining an installation license.
In addition, the four already operating SHPs in the areas of Samarina, Distrato, Vrysochori, and Agia Paraskevi (Kerasovo) in Konitsa are also included in the total number of projects with EIA Approval, installation licenses, and operating licenses. In summary, a total of 11 SHPs in the Aoos River Basin have received EIA Approval (including those with installation and operating licenses) (Map 2), five of which are located within the newly designated Protected Landscape and Protected Natural Formation (Table 1).

III. SHPs within the Protected Landscape and Protected Natural Formation (PLPNF)
A total of 10 SHPs has been identified within the area designated as a Protected Landscape and Protected Natural Formation (PLPNF), three fewer than in March 2026. These include one existing SHP with an operating license in Agia Paraskevi (Kerasovo), Konitsa, and nine SHPs with production licenses (Table 1).
Of the nine SHPs with production licenses, four have obtained EIA Approval (locations: Amarantos, Eptachori, Kefalovryso, and Mesopotamos). It should be noted that, according to Article 3 (paragraphs 9 and 10) of the Ministerial Decision establishing the terms and restrictions for the protection of the free-flowing river section designated as a PLPNF (YPEN/DDFPB/61148/1574, Gov. Gazette 381/D/11.06.2024), the five SHPs that have not obtained EIA Approval cannot proceed with the environmental licensing process, as they are now subject to the new regulatory requirements and environmental protection objectives established for the area.
Monitoring the four projects that have completed the environmental licensing process is particularly important, as they fall under the category of existing legally licensed projects. These projects may proceed with construction or operation, provided that their construction and operation do not conflict with the conservation objectives of the PLPNF (YPEN/DDFPB/61148/1574, Gov. Gazette 381/D/11.06.2024).

Developments Regarding the SHP on the Chelimodi Stream
In June 2026, MedINA, in collaboration with Callisto and the Grammos Environmental Association, submitted comments to the public consultation opposing the construction of a new small hydropower plant (SHP) on the Chelimodi stream, a tributary of the Sarantaporos River, within a Peripheral Zone of the Northern Pindos National Park.
The project directly conflicts with the recently approved Special Environmental Study (SES) for the Natura 2000 sites in Epirus and Western Macedonia. The study expressly prohibits the installation of hydropower plants and the construction of dams and weirs within the Park’s Peripheral Zones. The Ministry of Environment and Energy has clarified in its guidance to the competent authorities that approved Special Environmental Studies must be taken into account during environmental permitting. The proposed site lies just 50 metres from a Protected Landscape and Protected Natural Formation (PLPNF), and the project directly threatens the natural, unobstructed flow of the area’s rivers.

Through this intervention, we seek to ensure that permitting decisions comply with environmental legislation and are informed by current scientific evidence. MedINA continues to monitor developments closely to help protect biodiversity and free-flowing rivers.
Public Consultation on the New Spatial Planning Framework for Renewable Energy Sources
MedINA’s participation in the public consultation on the new Special Spatial Planning Framework for Renewable Energy Sources (SSPF-RES) in June 2026 marked an important intervention, with the submission of detailed comments and proposals concerning the provisions for Small Hydropower Plants (SHPs). MedINA highlighted significant gaps in the proposed framework regarding the protection of river ecosystems, the assessment of the cumulative impacts of SHPs, and adaptation to climate change.
More specifically, the proposals submitted during the public consultation included, among others, the following:
- Expanding exclusion zones for SHP development to include Natura 2000 sites, Protected Landscapes and Protected Natural Formations, and free-flowing rivers.
- Conducting a national mapping of free-flowing rivers to identify and protect river stretches of high ecological value and prevent their further fragmentation.
- Integrating climate change adaptation criteria, taking into account future hydrological conditions, water scarcity, and the resilience of river ecosystems.
- Introducing mandatory technical and ecological measures to ensure the free movement of fish and prevent SHP development in areas with significant fish populations.
Detailed comments submitted by MedINA during the public consultation, available in Greek here.
The new Special Spatial Planning Framework for Renewable Energy Sources was adopted in August 2026 (Government Gazette D΄ 694/19.08.2026). It introduces only limited changes to the rules governing the siting of small hydropower plants (SHPs) compared with the 2008 framework (Government Gazette B΄ 2464/03.12.2008). The new provisions do little to strengthen the protection of river ecosystems, particularly in the face of the cumulative impacts of multiple projects within the same river basin and the growing pressures associated with climate change.
A welcome, though limited, change is the ban (under Article 11) on the installation of SHPs in watercourses within the sub-basins of river water bodies classified as having bad ecological status or potential in the relevant River Basin Management Plans (RBMPs). The ban applies until the ecological status of the watercourse concerned recovers. In its comments submitted during the public consultation, MedINA proposed a similar ban with a broader scope that would also cover river water bodies classified as having poor ecological status or potential.
MedINA continues to work at local, national, and international levels to protect the free flow of rivers and tributaries in the region and to promote the establishment of a unified protection framework across the entire Aoos River Basin. These efforts aim to support the creation of Europe’s first Transboundary Wild River National Park, the Aoos/Vjosa River.
References:
1. Decentralised Administration of Epirus-Western Macedonia. Available at: https://www.apdhp-dm.gov.gr/
2. Geospatial Map of the Regulatory Authority for Waste, Energy and Water (RAAEY), November 2026. Available at: https://geo.rae.gr/
3. Dimopoulos, T., Sakellarakis, F.N., & Pappa, A. (2023). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, March 2023. Available at: https://med-ina.org/small-hpps-aoos-position/
4. Dimopoulos, T., & Pappa, A. (2023). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, July 2023. Available at: https://med-ina.org/small-hpps-aoos-position-july23-eng/
5. Dimopoulos, T., Papageorgiou, D., & Pappa, A. (2023). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, November 2023. Available at: https://med-ina.org/small-hydropower-plants-on-sarantaporos-aoos-and-voidomatis-rivers-november-2023/
6. Dimopoulos, T., Papageorgiou, D., Katsaros, A., & Spiliopoulou, K. (2024). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, May 2024. Available at: https://med-ina.org/small-hydropower-plants-on-sarantaporos-aoos-and-voidomatis-rivers-may-2024/
7. Dimopoulos, T., Linardaki, E., Dimopoulou, M., & Sakellarakis, F.N. (2024). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, November 2024. Available at: https://med-ina.org/small-hydropower-plants-on-sarantaporos-aoos-and-voidomatis-rivers-november-2024/
8. Dimopoulos, T., Linardaki, E., Dimopoulou, M., & Sakellarakis, F.N. (2025). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, July 2025. Available at: https://med-ina.org/shp-sarantaporos-aoos-voidomatis-july2025/
9. Dimopoulos, T., Linardaki, E., Dimopoulou, M., Makri, M., & Sakellarakis, F.N. (2026). Small Hydropower Plants in Sarantaporos, Aoos, and Voidomatis, March 2026. Available at: https://med-ina.org/el/myhe-sarantaporos-aoos-voidomatis-march-2026/
10. Platform for posting decisions on EIA Approvals, November 2026. Available at: https://aepo.ypeka.gr/
11. Diavgeia, November 2026. Available at: https://diavgeia.gov.gr/
12. Electronic Environmental Registry, November 2026. Available at: https://eprm.ypen.gr/
13. Ministry of Environment and Energy, Decision YPEN/DD FPB/115155/3787 “Designation of a section of the Aoos River Basin as a Protected Landscape and Protected Natural Formation” (Gov. Gazette 6679/B/27.11.2023).
14. Ministry of Environment and Energy, Decision YPEN/DD FPB/61148/1574 “Establishment of terms and restrictions for the protection and preservation of wild and free flow in the area of the protected natural formation and protected landscape of the Aoos River Basin in the Regional Unit of Ioannina, for activities carried out within the section designated by the decision YPEN/DD FPB/115155/ 3787/8.11.2023 of the Head of the General Directorate of Environmental Policy of the Ministry of Environment and Energy (B’ 6679)” (Gov. Gazette 381/D/11.06.2024).
This article was developed within the framework of the “Ri-Connect II” project, funded by PONT, and the “Aoos/Vjosa 2.0” project, coordinated by EuroNatur and funded by DIMFE.